
Condevo Spa
Marudo (Italy)
Via Luna, 24
26866 Marudo (LO) Italy
Phone: 00 39 0371 2151
Fax: 00 39 0371 217014
C.F – P.IVA: IT00766970156
info@condevo.it
amministrazione@condevopec.it

C1
Condevo Spa
Castiraga Vidardo (Italy)
C1 factory, 4.000 sqm First location of Giannoni SpA, Condevo SpA from 2014: R&D center: direction and offices, No 2 laboratories
(No 3 efficiency testing stations:1÷250 kW; No 36 life testing stations).

C1
Condevo Spa
Castiraga Vidardo (Italy)
C1 factory, 4,000 sqm first location of Giannoni SpA, Condevo SpA from 2014: R&D center: direction and offices, 2 laboratories
(3 efficiency test rigs 1÷250 kW, 36 long life test rigs).

C2
Condevo Spa
Castiraga Vidardo (Italy)
C2 factory, 4.500 sqm built in 1995: Various copper heat exchengers production lines. Painting rig for copper heat hexchengers.

C3
Condevo Spa
Marudo (Italy)
C3 factory, 16,000 sqm built in 2001: Headquarter and offices. Heat cells for condensing boilers production: 800.000 pcs/y capacity. 2 Full automatic production lines for stainless steel pipes (directly from stripe and continous laser welding) – 4 Full authomatic singol coils production rigs – 2 Full automatic assembly lines for condensing heat cells – Bithermal copperheat exchangers production line – Automatic storehouse for raw materials and components

C2
Condevo Spa
Castiraga Vidardo (Italy)
C2 factory, 4.500 sqm Built in 1995: Various copper heat exchangers production lines. Painting rig for copper heat exchangers.

C3
Condevo Spa
Marudo (Italy)
C3 factory, 16.000 sqm Built in 2001: Headquarter and offices. Heat cells for condensing boilers production: 800.000 pcs/y capacity. No 2 Full automatic production lines for stainless steel pipes (directly from stripe and laser welding) – No 4 Full authomatic single coil production rigs – No 2 Full automatic assembly lines for condensing heat cells – Bithermal copper heat exchangers production line – Automatic storehouse for raw materials and components.
Cmk
Condevo MK
Shtip (Macedonia)
Cmk factory, 17.000 sqm built in 2016
and 11.000 sqm built in 2018.
Condcell mass production in first quarter 2019.
