condevo-brand-tm
Condevo Spa
Marudo (Italy)

Via Luna, 24
26866 Marudo (LO) Italy

Phone: 00 39 0371 2151
Fax: 00 39 0371 217014

C.F – P.IVA: IT00766970156
info@condevo.it
amministrazione@condevopec.it

c1maps
C1-ok-2

C1

Condevo Spa
Castiraga Vidardo (Italy)
C1 factory, 4.000 sqm First location of Giannoni SpA, Condevo SpA from 2014: R&D center: direction and offices, No 2 laboratories
(No 3 efficiency testing stations:1÷250 kW; No 36 life testing stations).
C1-ok-2

C1

Condevo Spa
Castiraga Vidardo (Italy)
C1 factory, 4,000 sqm first location of Giannoni SpA, Condevo SpA from 2014: R&D center: direction and offices,  2 laboratories
(3 efficiency test rigs 1÷250 kW, 36 long life test rigs).
C2-ok-3

C2

Condevo Spa
Castiraga Vidardo (Italy)
C2 factory, 4.500 sqm built in 1995: Various copper heat exchengers production lines. Painting rig for copper heat hexchengers.
C3-ok-2

C3

Condevo Spa
Marudo (Italy)
C3 factory, 16,000 sqm built in 2001: Headquarter and offices. Heat cells for condensing boilers production: 800.000 pcs/y capacity. 2  Full automatic production lines for stainless steel pipes (directly from stripe and continous laser welding) – 4  Full authomatic singol coils production rigs – 2  Full automatic assembly lines for condensing heat cells – Bithermal copperheat exchangers production line – Automatic storehouse for raw materials and components
c2maps
C2-ok-3

C2

Condevo Spa
Castiraga Vidardo (Italy)
C2 factory, 4.500 sqm Built in 1995: Various copper heat exchangers production lines. Painting rig for copper heat exchangers.
c3maps
C3-ok-2

C3

Condevo Spa
Marudo (Italy)
C3 factory, 16.000 sqm Built in 2001: Headquarter and offices. Heat cells for condensing boilers production: 800.000 pcs/y capacity. No 2 Full automatic production lines for stainless steel pipes (directly from stripe and laser welding) – No 4 Full authomatic single coil production rigs – No 2 Full automatic assembly lines for condensing heat cells – Bithermal copper heat exchangers production line – Automatic storehouse for raw materials and components.
Macedonia-sede-1

Cmk

Condevo MK
Shtip (Macedonia)
Cmk factory, 17.000 sqm built in 2016
and 11.000 sqm built in 2018.
Condcell mass production in first quarter 2019.
Korea-DubalGIDEX-1

Dubal

Gidex Dubal Ltd
Dongchun-Dong
(South Korea)
Factory in South Korea, 3,000 sqm – 50% Property from 1998: Copper heat exchangers for higth efficiency boilers – Stainless steel plate heat exchangers for sanitary water – Burners
MacedoniaMaps
CondevoMK-Location

Cmk

Condevo MK
Shtip (Macedonia)
Cmk factory, 17.000 sqm built in 2016
and 11.000 sqm built in 2018.
Condcell mass production in first quarter 2019.
koreamaps
Korea-DubalGIDEX-1

Dubal

Gidex Dubal Ltd
Dongchun-Dong
(South Korea)
Factory in South Korea, 3.000 sqm Joint venture from 1998: Copper heat exchangers for high efficiency boilers – Stainless steel plate heat exchangers for sanitary water – Burners.